Untitled Page
ARCHIVED FORUM -- April 2007 to March 2012
READ ONLY FORUM
This is the first Archived Forum which was active between 17th April 2007 and
1st March February 2012
DSC00162.jpg
03-13-2008
Downloads: 112
File size: 0 B
Views: 1,524
So at this stage all the B&O installation cables are in place
and i thought at this point i should really connect everything up and
test, just to make sure everything is working correctly before i
plasterboard everything in.
Its also worth pointing out that the
ground floor in my house is a suspended floor so all cables from one
side of the room to the other can easily be hidden.