in Search
Untitled Page

ARCHIVED FORUM -- April 2007 to March 2012
READ ONLY FORUM

This is the first Archived Forum which was active between 17th April 2007 and 1st March February 2012

 

DSC00159.jpg
posted by Emmanuel92
03-13-2008


Downloads: 178
File size: 0 B
Views: 1,702
Filed under:

With all the paper and picture rail removed my attention was cast to the wall to the right of the chimney brest. This wall will have the BS9000, horizontally mounted with the other BL4000 at a high level.

Now this wall is plastered already (unlike the left side that had plasterboard nailed to the bare block) so i had to decide how to run my cables.

As you can see, i had marked out the position of the BS9000 bracket.