Untitled Page
ARCHIVED FORUM -- April 2007 to March 2012
READ ONLY FORUM
This is the first Archived Forum which was active between 17th April 2007 and
1st March February 2012
DSC00159.jpg
03-13-2008
Downloads: 178
File size: 0 B
Views: 1,702
With all the paper and picture rail removed my attention was cast to
the wall to the right of the chimney brest. This wall will have the
BS9000, horizontally mounted with the other BL4000 at a high level.
Now
this wall is plastered already (unlike the left side that had
plasterboard nailed to the bare block) so i had to decide how to run my
cables.
As you can see, i had marked out the position of the BS9000 bracket.